Reznor RA 140 Guia de Resolução de Problemas

Consulte online ou descarregue Guia de Resolução de Problemas para Aquecedores elétricos Reznor RA 140. Reznor RA 140 Troubleshooting guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
Form No. RZ-NA I-RA/D 140/235 (Version A)
Obsoletes Form I-RA/D 140/235
REZNOR
®
USED-OIL-FIRED
HEATERS AND BOILERS
Installation
and
Reference Guide
Heater Models
RA 140
RA 235
RAD 140
RAD 235
CSA Certified to Electrical and Fuel Burning requirements only.
P/N 110318 Rev 2
Vista de página 0
1 2 3 4 5 6 ... 51 52

Resumo do Conteúdo

Página 1 - Reference Guide

Form No. RZ-NA I-RA/D 140/235 (Version A)Obsoletes Form I-RA/D 140/235REZNOR® USED-OIL-FIREDHEATERS AND BOILERSInstallationandReference GuideHeater Mo

Página 2 - IMPORTANT

Form I-RA/D 140/235 (Version A), Page 10Fuel Tank,Pump, andSupply LinesFuel TankGeneral RequirementsModel RA/RAD 140 and RA/RAD 235 heaters are approv

Página 3 - Table of Contents by Page No

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 11Remote Fuel PumpThe Model OT-250 tank has a platform designed for attaching the remotefu

Página 4

Form I-RA/D 140/235 (Version A), Page 12Barometric DraftRegulatorTee with CleanoutBarometric DraftRegulator(alternate location)Oil FeedLine 3/8O.D.Co

Página 5

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 13Mounting theHeaterSuspensionGeneral RequirementsBefore suspending the unit, check the su

Página 6 - 3/4 (19mm)

Form I-RA/D 140/235 (Version A), Page 14Venting theHeaterWARNING: Failure to provide proper venting couldresult in death, serious injury, and/or prope

Página 7 - Additional Parts

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 15Vent CapFactory Built Vent8 ft (2.4M)MinimumSingle Wall PipeBarometric DraftRegulator(al

Página 8 - Combustibles

Form I-RA/D 140/235 (Version A), Page 16DraftRegulatorLoosen knoband slide in slotto change draft.IncreaseDecreaseDetailed Require-ments for the VentS

Página 9 - High Altitude Installation

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 17InstallingDuctsInlet Air DuctDischargeDuctInlet Air DuctCanadian installations require f

Página 10 - Fuel Tank

Form I-RA/D 140/235 (Version A), Page 18HeatingThermostatPump PowerInstallationPump PowerTo connect the electrical power from the heater to the pump,•

Página 11 - Supply Lines

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 19Priming andLeak CheckFor control locations,refer to illustration onpage 38Priming and Ch

Página 12

Form I-RA/D 140/235 (Version A), Page 2IMPORTANTNotice to Ownerand InstallerTo ensure the long term benefits of burning your used oil in a Reznor® Use

Página 13

Form I-RA/D 140/235 (Version A), Page 202. Set manual disconnect switch to the ON position.3. Fill the suction line (line between the supply tank and

Página 14 - Venting the

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 21Check-TestCheck Test - After Start-upCheck that there is sufficient draft for proper com

Página 15 - • The heater may be

Form I-RA/D 140/235 (Version A), Page 22Air ShutterCheck-TestContinuedWARNING: If there is insufficient draft, it will create aback pressure resulting

Página 16 - Regulator

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 23Check-TestContinued     Check Discharge Air Temperature - Model RAD with discharge

Página 17 - Discharge Duct

Form I-RA/D 140/235 (Version A), Page 24BackflowSensorSwitch onViewport DoorGeneralMaintenanceRequirementsWARNING: Turn off electric power to the unit

Página 18 - Main Power

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 25Every Six months:• Clean the oil strainer at the burner.• Clean the foot valve screen.•

Página 19 - Heater Start-Up

Form I-RA/D 140/235 (Version A), Page 26PumpScreenGasketCoverBoltspump cover. Go to the instructions for“Recharging the Suction Line” (below).2. Remov

Página 20 - Continued

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 27Cleaning Combustion Chamber, HeatExchanger and Flue PipeWARNING: Used oils may contain e

Página 21 - Start-Up Procedure

Form I-RA/D 140/235 (Version A), Page 28Removing Soot and Ash from the Combustion Chamber,Heat Exchanger, and Flue PipeMaintenanceContinuedInspecting

Página 22 - Check-Test

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 29CompressedAir FilterMaintenanceProceduresContinuedRemovingBurner andCleaning EndCone, No

Página 23

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 3Table of Contents by Page No.INSTALLATIONIntroduction ...

Página 24 - Maintenance

Form I-RA/D 140/235 (Version A), Page 30Removing Fuel Line Assembly to Service Controls andSpark Electrodes (Alternate method for servicing nozzle)WAR

Página 25 - Clean Internal Pump Screen

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 31MaintenanceProceduresContinuedTransformer in the“open” positionFuel Connection6. The fue

Página 26 - Recharging the Suction Line

Form I-RA/D 140/235 (Version A), Page 32Cleaning Oil Pre-Heater System(U.S. Patent No. 5,080,579)WARNING: Turn off the electric power and allow thepre

Página 27 - Inspection

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 33OuterCylinderInnerCylinderMaintenanceProceduresContinuedCleaning OilPre-HeaterSystem Con

Página 28 - (cont’d)

Form I-RA/D 140/235 (Version A), Page 34GeneralServiceReznor® used-oil-fired heaters have been designed and manufactured toprovide years of trouble fr

Página 29 - End Cone Removed

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 35assure that the correct atomizing air pressure is available, a pressure switchpermits oi

Página 30 - Procedures

Form I-RA/D 140/235 (Version A), Page 36Oil BurnerTroubleshootingTo diagnose malfunctions properly, the following test equipment is required:1) An ele

Página 31 - 3/8 (9.5mm)

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 37Location - The backflow sensor switch is mounted on a bracket on thehinged viewport cove

Página 32

Form I-RA/D 140/235 (Version A), Page 38Troubleshooting ContinuedLocation of Components Referenced in Troubleshooting ChartsBackflow Sensor Switchon t

Página 33 - Cylinder

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 39TroubleshootingContinuedChart No. 1 - Thermostat calling for heat;Burner motor never att

Página 34 - Service Notes

Form I-RA/D 140/235 (Version A), Page 4InstallationUseThis heater is for commercial or industrial use only.The heater should be installed by an experi

Página 35 - Operation

Form I-RA/D 140/235 (Version A), Page 40Oil Heat Exchanger and Fuel Line AssemblyReference Chart No. 1To remove the heatingelement, remove retainers/s

Página 36 - Troubleshooting

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 41TroubleshootingContinuedCheck for linevoltage across Terminals5 and 2. Is voltageread?Ch

Página 37 - Troubleshooting Chart Guide

Form I-RA/D 140/235 (Version A), Page 42Troubleshooting ContinuedCheck for linevoltage across Terminals8 and 11. Is voltageread?Is ignitiontransformer

Página 38 - Troubleshooting Continued

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 43TroubleshootingContinued1. Remove cad cell wires fromthe ignition controller. 2. Start t

Página 39

Form I-RA/D 140/235 (Version A), Page 44Bleed oil fromburner tee bleederfor ten minutes.Is stream of oilperfectly solid andcontinuous with nosign of a

Página 40

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 45Does the fan/bloweroperate?Are the heatexchanger surfacesand/or the fan blades or blower

Página 41

Form I-RA/D 140/235 (Version A), Page 46Fan and Limit ControlsModel RA/RAD 140 and 235 heaters are equipped with a fan control andlimit control assemb

Página 42

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 47TroubleshootingContinuedIs there sufficient oilin the supply tank?Is the pump turning?Is

Página 43

Form I-RA/D 140/235 (Version A), Page 48Wiring Diagram 147351 for Models RA/RAD 140/235Appendix115/1/6OMANUALDISCONNECTSWITCHGGGNDL#12 GA. W#12 GA. BK

Página 44

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 49RA(D) 140-235 DWG. #B-147351 REV. #11THERMOSTATTYFFYTRWCAD CELLSPARK GAPIGNITION CONT

Página 45

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 5Conventions Used in this ManualHazard Intensity LevelsDANGER: Failure to comply will resu

Página 46

Form I-RA/D 140/235 (Version A), Page 50Hour Meter/Cleaning RecordCleaning Meter Cleaning MeterDate Reading Initials Date Reading Initials

Página 47

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 51IndexAir Band and Air Shutter Settings ... 22Backflow Sensor Switch

Página 48 - Appendix

Form I-RA/D 140/235 (Version A), Page 52(800) 695-1901 Press 2www.ReznorHeaters.com©2005 Thomas & Betts Corporation, All rights reserved.MANUFACTU

Página 49 - REV. #11

Form I-RA/D 140/235 (Version A), Page 6Safety WarningsContinuedUnpackingandInspectionCheck the heater for any damage that may have occurred in shipmen

Página 50 - Hour Meter/Cleaning Record

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 7Parts CartonAdditional PartsShipped with each heater is a remote fuel pump and a carton o

Página 51

Form I-RA/D 140/235 (Version A), Page 8HeaterPlacementMinimumClearances fromCombustiblesDo not attempt to install this heater until you have read and

Página 52 - (800) 695-1901 Press 2

Form I-RA/D 140/235 (Version A), Mfg No. 110318 Rev 3, Page 9High Altitude InstallationStandard Model RA/RAD 140 and 235 used-oil-fired heaters are de

Comentários a estes Manuais

Sem comentários